AmeliaFoster
New member
A redesign can look finished while still leaving the owner dependent on the original developer. What deliverables should be required at handoff—source files, design system notes, repository access, deployment instructions, analytics checks, and a list of licensed assets? I would also include a short walkthrough and a defined period for fixing launch issues.